Refinery Emergency Standby System
Designed and installed a synchronized 4×1500kVA standby system for a major Pakistani refinery, ensuring uninterrupted operations during grid failures. Includes auto-paralleling and load-sharing logic.
From offshore platforms to factory floors, our generators have powered Pakistan's most demanding installations. Here's a look at projects we're proud to have delivered.
Designed and installed a synchronized 4×1500kVA standby system for a major Pakistani refinery, ensuring uninterrupted operations during grid failures. Includes auto-paralleling and load-sharing logic.
Supplied and commissioned a 2×1000kVA gas-powered captive prime power plant for a textile spinning mill. Optimized for continuous operation with WHR integration and dust-rated filtration.
Delivered a redundant N+1 standby power system for a 500-bed tertiary care hospital. Sub-10-second startup, NFPA-compliant, with dedicated medical-grade switchgear and quarterly compliance audits.
Multi-year AMC contract covering 80+ BTS sites across Pakistan. Hybrid genset+battery configurations with remote monitoring, scheduled servicing, and emergency response within 4 hours nationwide.
Synchronized 2×800kVA standby system for a major FMCG manufacturing plant. Protects 4 production lines and cold storage from grid fluctuations with auto-failover within 8 seconds.
18-month rental contract supplying mobile and stationary gensets to a major infrastructure project. Includes operator services, fuel supply, and 24/7 maintenance support throughout the contract.
Designed and installed a Tier III-aligned redundant generator architecture with paralleled units, automatic transfer switching, and a custom synchronization panel. Full SCADA integration delivered.
Engineered a 5MW captive power solution for a cement manufacturing plant using natural gas-fueled prime gensets. Custom enclosures rated for high-dust environments and continuous duty cycles.
"When our refinery's main switchgear failed at 2 AM, Universal's team had a 1500kVA unit synced to our bus within 3 hours. That's the response time you can't put a price on."
"We've worked with three vendors over 10 years. Universal is the only one whose AMC actually means something. Their engineers know our equipment better than we do."
"Their captive gas plant has been running 22 hours a day for two years. Fuel cost per kWh is 30% lower than what we projected. That's real engineering."